During Week 13 of the on-sky commissioning campaign with LSSTCam, Science Validation surveys continued as the primary nighttime activity with the goal of demonstrating sustained survey-mode operation and continuing to evaluate the distribution of delivered image quality. In-dome tests continued gathering the full set of calibration products needed for the updated LSSTCam sequencer, as described last week. The Auxiliary Telescope (AuxTel) continues to operate in parallel. The currently loaded filter set in LSSTCam is ugriz following the filter swap of y for u earlier in the week.
2 Likes